
Route 52 Causeway Crossing, Atlantic and Cape May Counties, NJSITE-BLAUVELT Engineers was awarded a contract by the project designer to complete a subsurface exploration program (using metric units) associated with replacing this bridge over the Great Egg Harbor.Employing the use of barge-, truck-, and track-mounted equipment, our crews completed over 160 meters of drilling on the embankment, over 254 meters of drilling on the water, and over 175 meters of drilling in wetlands areas. A total of three (3) drill rigs were mobilized during peak drilling operations. |
|
© 2002, SITE-BLAUVELT Engineers, Inc. - A TRC Company. For more information please contact our webmaster. What We Do | Employment Information | Home | SITE Map |